Project Detail

2020 – 2022

  • Proposed open pit and underground copper mine development in the Taroudant Province.
  • The ESIA included the mine footprint, 120 km water supply infrastructure, 110 km of powerline infrastructure and 10 km road infrastructure.
  • ESIA aligned to local regulatory and IFC PS and Equator Principles funder requirements.
  • Provided environmental and social inputs to the NI-43101 reporting.
  • Specialist studies including biodiversity, soils, hydrology, geohydrology, air quality, noise, stakeholder engagement, cultural heritage, geochemistry and climate risk.
  • Environmental inputs to the NI-43101 reporting.